Shear pin time, Fault indication, Application example – Rockwell Automation 20G PowerFlex 750-Series AC Drives User Manual

Page 189

Advertising
background image

Rockwell Automation Publication 750-RM002B-EN-P - September 2013

189

Diagnostics and Protection

Chapter 3

Shear Pin Time

If an immediate action is to be taken, set shear pin time to 0. If the shear pin level
is to be ignored for a period of time, enter that value into P437 [Shear Pin 1
Time] or P440 [Shear Pin 2 Time].

Generally, some value greater than 0 is entered in shear pin time to eliminate any
faults on very short peak current spikes. Thus eliminating nuisance tripping.

Fault Indication

A unique fault (Shear Pin 1, F61) or (Shear Pin 1, F62) is generated if the
function is activated and the condition occurs.

Application Example

By programming the Shear Pin feature, the drive faults, stopping the excess
torque before mechanical damage occurs.

Shear Pin - Gradual Loading

P7 [Output Current]

P436 [Shear Pin1 Level]

P3 [Mtr Vel Fdbk]

Motor Speed

Shear Point 1 Level

Increasing Load

Drive Faults

Seconds

Amps

Fre
qu

en

cy

Advertising
This manual is related to the following products: