Rockwell Automation 1753-PCS-PAR Using RSLogix Guard PLUS! with GuardPLC Controllers User Manual

Page 55

Advertising
background image

Publication 1753-PM001A-EN-P - November 2005

Create a GuardPLC Project 3-15

4. Minimize the Hardware Management window.

5. In the Project Management project tree, expand StandardLibs,

IEC61131-3, and Bistr as shown below.

6. Drag an AND and an OR block onto the routine (Left-click, hold,

drag and release).

TIP

You can delete the white areas under the
signals, which are used for descriptions, by
clicking the white area and hitting the Delete
key.

Advertising
This manual is related to the following products: