Rockwell Automation 1753-PCS-PAR Using RSLogix Guard PLUS! with GuardPLC Controllers User Manual
Page 55
Advertising
![background image](/manuals/579631/55/background.png)
Publication 1753-PM001A-EN-P - November 2005
Create a GuardPLC Project 3-15
4. Minimize the Hardware Management window.
5. In the Project Management project tree, expand StandardLibs,
IEC61131-3, and Bistr as shown below.
6. Drag an AND and an OR block onto the routine (Left-click, hold,
drag and release).
TIP
You can delete the white areas under the
signals, which are used for descriptions, by
clicking the white area and hitting the Delete
key.
Advertising
This manual is related to the following products: