Rockwell Automation 1753-PCS-PAR Using RSLogix Guard PLUS! with GuardPLC Controllers User Manual

Page 59

Advertising
background image

Publication 1753-PM001A-EN-P - November 2005

Create a GuardPLC Project 3-19

3. Choose points to toggle/view during the simulation. To activate

a point, left-click on a point, drag, release, and left-click again.

4. Start the simulation by left-clicking the blue flag button.

5. Double left-click the yellow field to toggle TRUE/FALSE. Blue

lines represent OFF. Red lines represent ON.

6. When finished testing, stop the simulation by choosing the Stop

icon.

7. Close the Off-line simulation using the Close OLS icon.

8. Click the PROJ tab to return to the project tree.

TIP

If you do not save your changes, you will
have to re-select the points to simulate.

Advertising
This manual is related to the following products: