Configuration – Rockwell Automation T6200 Compressor Anti-Surge and Capacity Controller User Manual
Page 122

Configuration
8-2
Build Project 16
Definitions 16
Cross references 16
Export / Import Projects 17
Function Block Diagram (FBD) 18
Loop (Program) Configuration 19
Program Organization Units 19
Data Types 20
Variables 20
Groups 20
Data type 20
Naming a variable 20
Constant expressions 21
Adaptation of Pre-Defined Configuration
22
T6200 FBD Configuration File Verification 24
Launch the FBD Configurator Workbench 24
T6200_FBD Variable Editing 25
T6200 FBD Function Editing 25
T6200 Loop Organization 26
T6200 Analog Input FB 27
T6200 Discrete Input FB 29
Access to Discretes 29
T6200 – PID FB & Variables 30
T6200 – Analog Output Definition 32
T6200 – Export-Import Definition 33
T6200 – Project Build 34
T6200 – Variable, Alarm & Tuning Settings 35
MICON OPC Server Start-up
39
MICON OPC Server Initialization 40
OPC Server Screens and Fields 41
OPC Server Configuration File Interface 44
CONFIGURATION