Hardware installation/maintenance – Rockwell Automation T6200 Compressor Anti-Surge and Capacity Controller User Manual
Page 23

Hardware Installation/Maintenance
3-1
Site Selection Considerations
3
Access Considerations
3
T6200 Unit Automating System Mounting
4
T6200 Controller Electrical Power Wiring
6
T6200R Subrack Electrical Power Connection
8
Input/Output Hardware Configuration
9
Signal Wiring
10
Wiring and Jumper Placement for T6200-C
Channels 1-8
12
Wiring and Jumper Placement for T6200-C
Channels 9-16 13
Wiring and Jumper Placement for T6200-C Channels 17-22, 31, and 32
14
Wiring and Jumper Placement for T6200-C Channels 23-26
16
Wiring for T6200-C Channels 27-30
17
Wiring and Jumper Placement for T6200-D Channels 1-26, 31, and 32
17
Wiring for T6200-D Channels 27-30
19
Ethernet Communication Network
19
Network Security
19
Ethernet Network Connectors 19
Network Cabling
20
Non-Redundant Network
20
Redundant Network 21
T6200R Subrack Ethernet 23
Operator Interface Installation
24
Firmware Changes
27
Serial Communication Connection
28
3
Section Three
Hardware Installation/Maintenance