Test 2 – dc power buss, Test 2 – dc power buss -40, Powermax – Hypertherm Powermax65 Service Manual Rev.1 User Manual

Page 166: Troubleshooting and system tests 5-40, Service manual test 2 – dc power buss

Advertising
background image

TroubleshooTing and sysTem TesTs

5-40

powermax

65/85

Service Manual

Test 2 – DC Power Buss

Resistance check

Note: All resistance values must be taken with the power cord disconnected and all internal power supply wires

attached.

• Remove the mounting screws from the bulk capacitors and pull the caps away from the power board.
• Measure resistances described in the following tables.

CSA

Test points

Value

TP 10 and 12

25 kΩ

TP 11 and 12

25 kΩ

CE

Test points

Value

TP 11 and 13

18 kΩ

TP 12 and 13

18 kΩ

WORK

LEAD

BLK

BLK

J13

J16

J17

J18

J19

J26

TP12

J28

TP10

TP11

WORK

LEAD

J13

J2

J1

J18

J19

J27

J30

J23

J24

TP13

J29

TP11

TP12

• Replace the bulk capacitor mounting screws before power-up.

Advertising
This manual is related to the following products: