Powermax, Troubleshooting and system tests, Service manual 5-41 – Hypertherm Powermax65 Service Manual Rev.1 User Manual

Page 167

Advertising
background image

TroubleshooTing and sysTem TesTs

powermax

65/85

Service Manual

5-41

WORK

LEAD

J13

J2

J1

J18

J19

J27

J30

J23

J24

TP13

J29

TP11

TP12

WORK

LEAD

BLK

BLK

J13

J16

J17

J18

J19

J26

TP12

J28

TP10

TP11

Voltage check

All voltages must be measured with the input power connected and the machine on.

Note: Wear proper personal protective equipment (PPE) before testing powered equipment. All values are ±15%.

• Check the inverter IGBT voltages as described below.
• The voltage measured across the bulk capacitors (half the buss voltage or the smaller values above) should be

the same before and during torch operation.

375 VDC

Bulk capacitors

Bulk capacitors

Inverter IGBT

module

425 VDC

280 VDC

750 VDC

850 VDC

560 VDC

375 VDC

425 VDC

280 VDC

CSA 200-480 VAC

input

CSA 600 VAC

input

CE 400 VAC

input

CSA

CE

Advertising
This manual is related to the following products: