Install water piping, Gv90, Boiler manual – Weil-McLain GV90+ User Manual

Page 21

Advertising
background image

Part number 550-142-054/0411

21

GV90+

gas

-

fired

water

boiler

— Boiler Manual

Figure 25

Auto return temp regulation — circulator

zoning

Piping snow melt systems or combination

snow melt/space heating systems

Combination snow melt/space heating systems can have return water
temperature below 60°F, and the return temperature will fluctuate. So
these systems require automatic return water temperature as shown in
Figure 25 (zone-valve zoning) or Figure 26 (circulator zoning).

Select an automatic temperature control valve or motor-operated valve
which can be adjusted to provide a return water temperature of at least
60°F. Any setting higher than 60°F will also be acceptable.

Zone-valve zoning — The suggested piping uses a separate circulator
for system circulation to assure good temperature distribution in the
system when the return water temperature is low.

Circulator zoning — The GV90+ internal circulators must not be
removed. Provide a separate circulator for each zone.

The return water temperature to the boiler must be

at least 60°F. Provide and apply means to regulate the

return temperature. Failure to do so can result in boiler

control operation problems, causing possible significant

property damage.

Zoning with zone valves

— Each zone in the piping

diagrams in this section is shown with an isolation valve

on each side. Substitute a memory-stop valve for one of

these in each zone in order to use the memory-stop valve

for balancing flow as well as isolation.

Provide a separate 24-volt transformer to power the zone

valves. Size the transformer to handle the total rated load

of all connected zone valves.

Zoning with circulators

— The GV90+ internal system

circulator cannot be removed from the boiler for use as

one of the zone circulators. It must remain as shipped

from the factory to allow proper flow control inside the

boiler. You will need a circulator for each zone. Provide

circulator relays or circulator zone controller.

The sys-

tem circulator must be supplied by the installer.

MINIMUM

Boiler loop pipe size

GV90+3/4
GV90+5/6

1”

1¼”

MINIMUM

Boiler loop pipe size

GV90+3/4
GV90+5/6

1”

1¼”

Legend

1 Isolation valves
2 Automatic air vent (with diaphragm-type expansion tank), or

connect to tank fitting (closed-type expansion tank).

3 Diaphragm- or bladder-type expansion tank, if used (For closed-

type expansion tank, pipe from top of air separator to tank fitting
as in Figure 15, page 14.)

4 Zone valve
5 System or zone circulator
6 Flow/check valve
7 Hose bibb purge valve
8 Boiler pressure/temperature gauge
9 System supply temperature gauge
10 Return temperature automatic mixing valve
11 Differential pressure by-pass valve
16 Cold water fill line — see Figure 15, page 14 for typical components

Figure 26

Auto return temp regulation — zone valve

zoning

Install water piping

(continued)

Advertising