Prepare the boiler, Gv90, Boiler manual – Weil-McLain GV90+ User Manual

Page 9

Advertising
background image

Part number 550-142-054/0411

9

GV90+

gas

-

fired

water

boiler

— Boiler Manual

Prepare the boiler

(continued)

Figure 7

Install condensate trap

A In-line flue drain
B Flue drain nipple
C Flue drain hose
D Flue connection
E Condensate trap tee
F U-clamp and nuts (not

shown)

G Condensate drain

nipple

H Condensate trap hose
J Hose clamps

Finished assembly

Install condensate trap

1. Before placing the boiler in position, install the condensate trap

line, shown in Figure 7. Items shown are provided with the boiler.

Step 1

Attach the flue drain hose (C) to the in-line flue drain

nipple (B).

Step 2

Slide a screw driver or pencil through the condensate

drain nipple (G).

Slide the end of the screwdriver or pencil into the open

end of the flue drain hose (C).

Feed the in-line flue drain (A) assembly into the flue con-

nection (D), guiding the flue drain hose through the con-

densate drain nipple (G) with the screwdriver or pencil.

Step 3

Press the in-line flue drain (A) into the flue connection

(D) and through the seal ring until it reaches the stop.

Then tighten the flue connection hose clamp to secure.

The flue drain hose (C) should now extend down past the

end of the condensate drain nipple (G).

Step 4

Slide the U-clamp (F) over the condensate trap tee (E)

and into the two holes in the rail. Attach the two nuts pro-

vided to the U-clamp and tighten to secure the condensate

trap tee to the rail.

Step 5

Slide the ends of the condensate trap hose (H) onto the

condensate drain nipple (G) and the condensate trap tee

(E). Secure the condensate trap hose at each end with the

hose clamps (J).

Check the height of the condensate trap tee outlet

.

Before rotating the boiler into position, measure the

distance from the condensate tee outlet to the bottom

of the boiler mounting rails. When the boiler is place in

position, the condensate tee outlet must be higher than

the condensate pump inlet connection (when a con-

densate pump is used). Increase the foundation height

if necessary.

Advertising