Foundation

Provide a solid brick or concrete foundation pad if any of the following
is possible:
• When the floor can become flooded.
• When the boiler mounting area is not level.
• When a high-profile condensate pump is used, provide a foundation

high enough that the GV90+ condensate connection is at least as high

as the condensate pump inlet connection.

Figure 3

Minimum foundation dimensions (inches)

Boiler model

W

L

H *

GV90+3 / GV90+4

16

30¾

2

GV90+5 / GV90+6

16

37¾

2

* Increase height if needed to ensure
condensate trap outlet tee is above inlet
of condensate pump, when used.

Residential garage installation

Precautions

Take the following special precautions when installing the boiler in a
residential garage. If the boiler is located in a residential garage, per ANSI
Z223.1, paragraph 5.1.9
:
• Mount the boiler a minimum of

18 inches above the floor

of the

garage to assure the burner and ignition devices will be no less than

18 inches above the floor.

• Locate or

protect the boiler

so it cannot be damaged by a moving

vehicle.

Minimum clearances

You can install GV90+ boilers in spaces smaller than Fig-

ure 2, page 6 recommended service clearances, but never

smaller than shown in Figure 4.

Installations with clearances less than shown in Fig-

ure 2, page 6 must have air openings sized and located as

shown in Figure 4.

• Always provide at least screwdriver clearance to jacket front panel screws

for removal of front panel for inspection and minor service.

• If the boiler

cannot be serviced in place

, pipe the boiler with unions

and isolation valves so it can be slid out of the space and serviced in

an adjacent area.

• The space has to be equipped with a door so boiler can be accessed,

unpiped and removed.

Prepare boiler location

(continued)

Figure 4

Minimum clearances — when

clearances are less than recom-

mended service clearances of Fig-

ure 2, page 6, install as shown below:

A Area adjacent to access door must be accessible

and must allow for removal of the GV90+boiler

for service.

No other appliance or air mover (exhaust fan,

etc.) may be mounted in the same space.

B Access DOOR with fresh air openings
C Provide (2) Fresh air openings — Each with at

least 1 sq. inch per 1,000 Btuh of boiler input

NOTICE SPECIAL REQUIREMENTS

FOR AIR OPENINGS

: For installations

with clearances less than recommended

service clearances (Figure 2, page 6), but

no less than shown in Figure 4

— An

access door must be provided, fitted with

two air openings as shown in Figure 4.

Each opening must have a free area no

less than 1 square inch per 1000 Btuh

input of the GV90+ boiler in the space.

DO NOT apply the air opening sizes

given in Figure 42, page 36 or Fig-

ure 60, page 50

.