Multiple boiler installations

Placing multiple boilers

1. Locate multiple boilers in boiler room according

to:
a. Figure 28 (side-to-side), or
b. Figure 29 (back-to-back).

2. Provide the clearances indicated in the illustrations

listed above to provide for access and servicing. If
these recommended dimensions are not possible,
provide at least the recommended service clearances
given on page 6. Also follow local codes.

3. Construct boiler foundation if boiler room floor

is uneven or if there is a danger of flooding. Size
foundation to allow for clearance and spacing di-
mensions shown in the illustrations at right.

4. Chalkline boiler locations on foundation or boiler

room floor.

5. Uncrate, assemble and mount boilers according to

instructions in this manual.

6. Provide clearance for installation of venting, air

piping, gas piping, expansion tank, primary circula-
tor and other accessories.

Controlling multiple GV90+

boilers

1. Multiple GV90+ boilers can be controlled using any

boiler control/sequencing system that provides an

isolated contact for call for heat (connected to the

boiler's T-T terminals).

Piping multiple GV90+ boilers

1. See suggested piping diagrams in this manual.

Contact Weil-McLain for assistance for systems

not covered.

2. Always pipe the boilers on a secondary loop in a

primary/secondary circuit as shown in the examples

in this manual.

Figure 28

Side-to-side mounting of multiple GV90+ boilers,

showing RECOMMENDED clearances

Figure 29

Back-to-back installation of multiple GV90+ boilers,

showing RECOMMENDED clearances