Multiple boiler water piping, Gv90, Boiler manual – Weil-McLain GV90+ User Manual

Page 26

Advertising
background image

Part number 550-142-054/0411

GV90+

gas

-

fired

water

boiler

— Boiler Manual

26

Multiple boiler water piping

(continued)

Legend — Figure 33

1 Flow/check valve (each boiler)
2 Isolation valves (when used)
3 Caps
4 Easy-Fit® Manifold (supply) — layout and size per page 24
5 Easy-Fit® Manifold (return) — layout and size per page 24
6 Primary circulator
7 Expansion tank (diaphragm type)
8 System air eliminator
9 System automatic air vent
16 Cold water fill line — see Figure 32, page 25 for typical com-

ponents

17 3-way diverting valve (operated by DHW aquastat — valve end

switch connects across boiler thermostat terminals)

18 System supply
19 System return
20 Boiler relief valve and discharge piping, installed per GV90+

Boiler Manual

21 Indirect-fired storage water heaters — Example is shown connect-

ed to one boiler of the system. The indirect water heater could
also be connected with a secondary connection off the main
header, as in Figure 34, page 27.

Figure 33

Piping layout — typical for multiple GV90+ boilers, using Weil-McLain Easy-Fit manifolds (2-boiler system)