Weil-McLain GV90+ User Manual

Page 4

Advertising
background image

Part number 550-142-054/0411

GV90+

gas

-

fired

water

boiler

— Boiler Manual

4

How it works . . . . . . . . . . . . . . 2

GV90+ Water Boiler . . . . . . . . . 3

Please read before proceeding . . . 5

Prepare boiler location . . . . . . . 6

Installations must follow these codes: . . . 6
High altitude installations. . . . . . . . . . 6
Residential garage installation . . . . . . . 7
Check orifice plate — replace if necessary . 8
Install condensate trap. . . . . . . . . . . . 9
Install high altitude air pressure switch when

required (only above 5,550 feet) . . . . . . 9
Rotate the boiler into position . . . . . . 10
Perform hydrostatic pressure test . . . . . 11

Install water piping . . . . . . . . 12

General piping information. . . . . . . . 12
Install relief valve . . . . . . . . . . . . . 12
Expansion tank. . . . . . . . . . . . . . . 13
System water piping methods. . . . . . . 15
Circulators . . . . . . . . . . . . . . . . . 15
Simplified pipe/circulator selection . . . 15
Baseboard system piping — CIRCULATOR

zoning (primary/secondary) . . . . . . . 16
Baseboard system piping — ZONE VALVE

zoning (direct connection) . . . . . . . . 16
Radiator system piping . . . . . . . . . . 18
Single-zone radiant heating or heat pump 19
Adjust balancing valves . . . . . . . . . . 19
Multi-zone radiant heating system . . . . 20
Piping snow melt systems or combination

snow melt/space heating systems . . . . . 21
Water chiller systems . . . . . . . . . . . 22

Multiple boiler installations . . . . 23

Placing multiple boilers . . . . . . . . . . 23
Controlling multiple GV90+ boilers . . . 23
Piping multiple GV90+ boilers . . . . . . 23

Multiple boiler water piping . . . . 24

Easy-Fit® piping installation . . . . . . . 24

Venting & air — general . . . . . . 29

When removing a boiler from an existing

common vent system . . . . . . . . . . . 29
Existing vent test procedure. . . . . . . . 29
Provide combustion air: . . . . . . . . . . 30
Vent and air termination options. . . . . 30
DIRECT VENT installations . . . . . . . 30
DIRECT EXHAUST installations. . . . . 30
Combustion air contamination: . . . . . 30
Manifolded combustion air option for

DIRECT VENT multiple boiler installations

31
Air manifold sizing . . . . . . . . . . . . 31

Commonwealth of Massachusetts

installations . . . . . . . . . . . . 34

Vent termination requirements . . 35

DIRECT VENT — Boiler room air

openings . . . . . . . . . . . . . . 36

DIRECT VENT — Sidewall with W-M

vent/air plate . . . . . . . . . . . . 37

DIRECT VENT — Sidewall with sepa-

rate pipes. . . . . . . . . . . . . . 39

DIRECT VENT — Sidewall with 3”

concentric . . . . . . . . . . . . . 41

DIRECT VENT — Vertical with sepa-

rate pipes. . . . . . . . . . . . . . 43

DIRECT VENT — Vertical with 3”

concentric . . . . . . . . . . . . . 45

Concentric termination assembly

(sidewall or vertical). . . . . . . . 47

Vent and air piping and boiler con-

nections . . . . . . . . . . . . . . 48

DIRECT EXHAUST & DIRECT VENT . 48
Follow termination instructions . . . . . 48
Installing vent and air piping . . . . . . . 48
DIRECT EXHAUST ONLY . . . . . . . . 48

DIRECT EXHAUST — Boiler room air

openings . . . . . . . . . . . . . . 49

Combustion air provision. . . . . . . . . 49
Sizing combustion air openings . . . . . 49
Special considerations . . . . . . . . . . . 49
GV90+ boiler WITHOUT other appliances

in room . . . . . . . . . . . . . . . . . . . 50
Air openings . . . . . . . . . . . . . . . . 50
GV90+ boiler WITH other appliances in

room . . . . . . . . . . . . . . . . . . . . 50

DIRECT EXHAUST — Sidewall . . 51

DIRECT EXHAUST — Vertical. . . 53

Gas piping . . . . . . . . . . . . . 54

Connecting gas supply piping. . . . . . . 54
Natural Gas. . . . . . . . . . . . . . . . . 55
Propane Gas . . . . . . . . . . . . . . . . 55

Wiring . . . . . . . . . . . . . . . 56

Field wiring. . . . . . . . . . . . . . . . . 56

Start-up. . . . . . . . . . . . . . . 59

Freeze protection (when used) . . . . . . 59
Clean system to remove sediment . . . . 59
Water chemistry . . . . . . . . . . . . . . 59
Antifreeze. . . . . . . . . . . . . . . . . . 59
Check for gas leaks. . . . . . . . . . . . . 60
Fill and test water system . . . . . . . . . 60
Verify gas/air orifice plate . . . . . . . . . 61
Check thermostat circuit(s) . . . . . . . . 61
Inspect/fill condensate system . . . . . . 61
Final checks before starting boiler . . . . 62
To start the boiler . . . . . . . . . . . . . 62
If boiler does not start correctly . . . . . 62
Check system and boiler after start-up . . 62
Gas valve adjustment — altitude over 5,500

feet ONLY . . . . . . . . . . . . . . . . . 62

Final checklist . . . . . . . . . . . . . . . 64

Annual start-up and general mainte-

nance schedule . . . . . . . . . . 67

Annual start-up . . . . . . . . . . 68

Address reported problems . . . . . . . . 68
Inspect boiler area . . . . . . . . . . . . . 68
Inspect boiler interior . . . . . . . . . . . 68
Inspect condensate drain system . . . . . 68
Inspect all piping for leaks . . . . . . . . 68
Inspect gas piping . . . . . . . . . . . . . 68
Inspect the water system. . . . . . . . . . 68
Inspect expansion tank . . . . . . . . . . 68
Inspect air openings . . . . . . . . . . . . 69
Inspect vent system and air piping . . . . 69
Inspect boiler heating surfaces . . . . . . 69
Inspect recuperator . . . . . . . . . . . . 69
Inspect igniter . . . . . . . . . . . . . . . 69
Inspect temperature mixing system . . . 70
Inspect limit controls and cutoffs. . . . . 70
Inspect gauges . . . . . . . . . . . . . . . 70
Inspect blower motor . . . . . . . . . . . 70
Inspect oiled-bearing circulators . . . . . 70
Inspect boiler relief valve . . . . . . . . . 71
To complete Annual Start-up, perform

startup and checks: . . . . . . . . . . . . 71
Review with owner. . . . . . . . . . . . . 71

Service & maintenance . . . . . . 72

Cleaning boiler heating surfaces . . . . . 72
Inspecting and cleaning the recuperator . 73

Troubleshooting . . . . . . . . . . 75

VERIFY PROPER OPERATION AFTER

SERVICING. . . . . . . . . . . . . . . . . 75
Before troubleshooting . . . . . . . . . . 75
Check the following . . . . . . . . . . . . 75
Checking the air pressure switch . . . . . 75
Igniter. . . . . . . . . . . . . . . . . . . . 76
Gas Valve . . . . . . . . . . . . . . . . . . 76
Blower Housing . . . . . . . . . . . . . . 76
Thermal fuse . . . . . . . . . . . . . . . . 76
Return temperature sensor . . . . . . . . 76
IBC (integrated boiler control) . . . . . . 77
IBC indicator lights — lockout modes . . 77
IBC indicator lights — non-lockout modes

77

Replacement parts . . . . . . . . 89

Dimensions and ratings. . . . . 100

NOTES . . . . . . . . . . . . . . 104

NOTES . . . . . . . . . . . . . . 106

Handling ceramic fiber and fiber-

glass materials. . . . . . . . . . 107

Installation and service

certificate . . . . . . . . . . . . 108

Contents

Advertising