Prepare the boiler, Gv90, Boiler manual – Weil-McLain GV90+ User Manual

Page 8

Advertising
background image

Part number 550-142-054/0411

GV90+

gas

-

fired

water

boiler

— Boiler Manual

8

Prepare the boiler

(continued)

Check orifice plate — replace if necessary

The

correct orifice plate

must be used. Failure to do so

will result in severe personal injury, death or substantial

property damage.

The boiler is shipped with a natural

gas orifice plate. It MUST BE CONVERTED to use

propane.

Natural gas:

For natural gas installations,

inspect the silver gas/air orifice plate

marking

. It must be the same as the boiler size. If the orifice plate is

stamped with another size, obtain the correct plate from your whole-

saler. The boiler size is stamped where the “X” is shown in the plate

stamping, Figure 6.

Propane:

For propane installations,

replace the silver gas/air orifice plate

with the red/white plate

, per following instructions. Ensure the red/

white plate boiler size is correct for the GV90+ boiler being installed.

The boiler size is stamped where the “X” is shown in the plate stamp-

ing, Figure 6.

Also fill out the propane label in the conversion kit and attach to the

left side of the jacket, above the gas inlet opening, as shown in Figure 5.

Orifice plate installation, when required

Access the bottom of the blower housing as shown in Figure 5.

To inspect the plate only,

read the marking on the plate edge

. It

must read the same as the boiler size and fuel, as follows:

Boiler model

Natural gas marking

Propane marking

GV90+3

NG 3 SEC

LP 3 SEC

GV90+4

NG 4 SEC

LP 4 SEC

GV90+5

NG 5 SEC

LP 5 SEC

GV90+6

NG 6 SEC

LP 6 SEC

To replace the plate, using a

manual screwdriver or nut driver

, see

Figure 6:
1. Loosen screws

1

and

2

two full turns.

2. Remove screws

3

and

4

.

3. Pull the gas/air orifice plate forward to remove it.
4. Slide in the new plate as shown in Figure 6. The

red side of a

propane plate must go next to the blower housing

.

5. Replace screws

3

and

4

. Tighten all four screws securely and uni-

formly.

DO NOT

overtighten.

DO NOT

exceed 40 inch-pounds

torque.

6. Bend down plate label tab at score mark as shown in lower right

corner of Figure 6, item 10.

DO NOT use electric or pneumatic screwdrivers to re-

move or tighten the gas/air boss screws. Hand-tighten

only, using manual screwdriver. Should the torque exceed

40 inch-pounds, the threaded holes could strip out,

causing an inadequate seal of the orifice plate. Failure to

properly seal the plate to the housing could result in a gas

leak, causing severe personal injury, death or substantial

property damage.

Figure 5

Check for correct gas orifice plate

A Remove jacket front

panel to access the bot-

tom side of the blower

housing.

B Complete the propane

conversion label includ-

ed with the conversion

kit. Install label on jacket

left side, as shown.

Leave the boiler on its back,

on the skid as shown, until

you have checked the gas/air

orifice plate and replace it if

necessary.

Figure 6

Follow instructions to check or replace

gas orifice plate ("X" = boiler size)

1–4 Screws — follow instructions for loosening and tightening

5

Gas/air manifold

6

Front section, bottom view, component details omitted

7

Side shown must point toward air inlet hose — WARNING

label side for natural gas; WHITE side for propane gas

8

Propane orifice plate, RED one side and WHITE on the

other (red side must face the blower housing

9

Natural gas orifice plate, SILVER

10

Orifice plate after bending along score mark — label is

visible when installed

Advertising