Direct vent, Sidewall with separate pipes, Gv90 – Weil-McLain GV90+ User Manual

Page 39: Boiler manual

Advertising
background image

Part number 550-142-054/0411

39

GV90+

gas

-

fired

water

boiler

— Boiler Manual

DIRECT VENT —

Sidewall with separate pipes

Allowable vent/air pipe materials &

lengths

Use only the vent materials and kits

listed in Figure 40, page 33. Provide

pipe adapters if specified.

1. Locate the termination such that the total air

piping and vent piping from the boiler to the

termination will not exceed the maximum

length given in Figure 39, page 32.

Determine termination location

1. The air and vent terminations must be in-

stalled as shown in Figure 47, page 39 and

Figure 49, page 40.

2. The terminations must comply with clearances

and limitations shown in Figure 41, page 35.

3. Locate the terminations so they are not likely

to be damaged by foreign objects, such as

stones or balls, or subject to buildup of leaves

or sediment.

Do not exceed the maximum lengths

of the outside vent piping shown in

Figure 47, page 39. Excessive length

exposed to the outside could cause

freezing of condensate in the vent

pipe, resulting in potential boiler

shutdown. In extremely cold cli-

mates, install an insulated chase

around the vent piping, particu-

larly when using longer lengths. The

chase must allow for inspection of

the vent pipe, and insulation must

be protected from water.

Multiple vent/air terminations

1. When terminating multiple GV90+ boilers,

terminate each vent/air connection as de-

scribed in this manual.

All vent pipes and air inlets must

terminate at the same height to

avoid possibility of severe personal

injury, death or substantial property

damage.

2. Place wall penetrations to obtain minimum

clearances shown in Figure 48, page 40 for

U. S. installations. For Canadian installations,

provide clearances required by CSA B149.1 or

B149.2 Installation Code.

3. The air inlet of a GV90+ boiler is part of a

direct vent connection. It is not classified as a

forced air intake with regard to spacing from

adjacent boiler vents.

4. Combustion air (NOT vent piping) can be

manifolded as shown in Figure 37, page 31.

Figure 47

INSTALLATION SEQUENCE — Separate pipes sidewall

Step 1 Read and follow all instructions in this manual. DO NOT proceed with

vent/air installation until you have read page 29 through page 35.

Step 2 Install the boiler in a location that allows proper routing of all vent and air

piping to the selected sidewall location.

Step 3 Make sure the selected sidewall termination location complies with Fig-

ure 41, page 35. (Multiple boiler sidewall plates must also comply with
Figure 48, page 40.)

Step 4 Use only the vent materials listed in Figure 40, page 33. Provide pipe adapt-

ers where required. Vent piping and air piping lengths must not exceed the
values shown in Figure 39, page 32.

Step 5 Prepare the sidewall penetrations and secure the sidewall plates as instructed

in this section. See “Prepare wall penetrations” on page 40.

Step 6 The air piping must terminate in a down-turned elbow as shown above.

The vent piping must terminate in an elbow pointed outward or away

from the air inlet as shown above. See illustration above.

Step 7 Install vent and air piping between the boiler and the sidewall openings.

Slope horizontal piping downward toward the boiler at least 1/4 inch per
foot. See page 48 for general guidelines.

Step 8 Install pipe supports every 5 feet on both the horizontal and vertical runs.

Install a hanger support within 6 inches of any upturn in the piping.

Step 9 Attach the vent termination exterior piping: Use either of the configurations

shown above, as needed to ensure clearance above grade or snow line.

Step 10 The vent and air pipes may run up as high as 4 feet with no enclosure. The

vent and air pipes must be secured with braces, and all clearances and lengths
must be maintained. Space braces no further than 24 inches apart.

Step 11 External venting greater than 4 feet requires an insulated enclosure around

the vent and air pipes. The vent and air terminations must exit through

the enclosure as shown in the illustration above, maintaining all required
clearances.

Advertising