Direct vent, Vertical with separate pipes, Gv90 – Weil-McLain GV90+ User Manual

Page 43: Boiler manual

Advertising
background image

Part number 550-142-054/0411

43

GV90+

gas

-

fired

water

boiler

— Boiler Manual

DIRECT VENT —

Vertical with separate pipes

Allowable vent/air pipe materials &

lengths

Use only the vent materials and kits listed

in Figure 40, page 33. Provide pipe adapt-

ers if specified.

1. Locate the terminations such that the total air pip-

ing and vent piping from the boiler to the termina-

tion will not exceed the maximum length given in

Figure 39, page 32.

Determine termination location

1. The air and vent terminations must be installed as

shown in Figure 53, page 43.

2. The terminations must comply with clearances and

limitations shown in Figure 41, page 35.

3. Locate the terminations so they are not likely to be

damaged by foreign objects, such as stones or balls,

or subject to buildup of leaves or sediment.

Multiple vent/air terminations

(Figure 54)

1. When terminating multiple GV90+ boilers, ter-

minate each vent/air connection as described in

this section.

Terminate all vent pipes at the same

height and all air pipes at the same height

to avoid possibility of severe personal

injury, death or substantial property

damage.

2. Place roof penetrations to obtain minimum clear-

ance of 12 inches between edge of air intake elbow

and adjacent vent pipe of another boiler for U. S.

installations (see Figure 54, page 44). For Canadian

installations, provide clearances required by CSA

B149.1 or B149.2 Installation Code.

3. The air inlet of a GV90+ boiler is part of a direct

vent connection. It is not classified as a forced air

intake with regard to spacing from adjacent boiler

vents.

Prepare roof penetrations

1. Air pipe penetration:

a. Cut a hole for the air pipe. Size the air pipe

hole as close as desired to the air pipe outside

diameter.

2. Vent pipe penetration:

a. Cut a hole for the vent pipe. For either combus-

tible or noncombustible construction, size the

vent pipe hole at least 0.4” larger than the vent

pipe diameter (4” hole for 3” PVC).

b. Insert a galvanized metal thimble in the vent

pipe hole.

Figure 53

Separate pipes vertical termination

Step 1 Read and follow all instructions in this manual. DO NOT proceed

with vent/air installation until you have read page 29

through page 35.

Step 2 Install the boiler in a location that allows proper routing of all vent

and air piping to the selected sidewall location.

Step 3 Make sure the selected vertical termination location complies with

Figure 41, page 35. (Multiple boiler terminations must also comply
with Figure 54, page 44.)

Step 4 Use only the vent materials listed in Figure 40, page 33. Provide pipe

adapters where required. Vent piping and air piping lengths must not
exceed the values shown in Figure 39, page 32.

Step 5 Prepare the vertical penetrations and secure penetration components

as instructed in this section. See “Prepare roof penetrations” on page 43
and “Termination and fittings” on page 44.

Step 6 The air piping must terminate in a 180-degree return bend or down-

turned elbow as shown above. The vent piping must terminate in a

coupling pointed upward as shown above.

Step 7 Install vent and air piping between the boiler and the vertical termina-

tions. Slope horizontal piping downward toward the boiler at least 1/4
inch per foot. Install pipe supports every 5 feet on both the horizontal

and vertical runs. Install a hanger support within 6 inches of any upturn
in the piping. See page 48 for general guidelines.

Step 8 Insert the vent and air piping through the vertical penetrations and

secure the termination fittings.

Step 9 Maintain clearances shown above. Vent and air terminations must be

fitted with a bird screen as shown.

Advertising