Direct vent, Vertical with 3” concentric, Gv90 – Weil-McLain GV90+ User Manual

Page 46: Boiler manual

Advertising
background image

Part number 550-142-054/0411

GV90+

gas

-

fired

water

boiler

— Boiler Manual

46

DIRECT VENT —

Vertical with 3” concentric

(continued)

Mount concentric termination

1. Mount the termination as shown in Figure 57, page 46.
2. Support the concentric vent/air termination at the roof penetration

as shown in Figure 57.
• The supports/bracing used must support the termination as-

sembly to prevent vertical slippage or sideways movement.

• The clamps used on the outside of the termination pipe must

not cut into the pipe or contain sharp edges that could cause

a crack to form.

The vent and air piping must be securely supported,

and must not rest its weight on the boiler fittings. DO

NOT drill or screw into either the vent pipe or air pipe.

Failure to properly support the vent and air piping could

result in vent piping damage, resulting in possible severe

personal injury, death or substantial property damage.

When inserting the partially-assembled termination

kit through the roof penetration, wrap plastic or other

protection over the end of the exposed assembly to pre-

vent debris from entering the pipes. If the air passages

become blocked, the boiler will not operate. Once the

rain cap has been cemented to the assembly, there is no

way to correct the problem. The assembly would have

to be replaced if it were cut to be removed and cleaned.

Altering the assembly in any way could result in severe

personal injury or death due to toxic flue product emis-

sions.

When using AL294C stainless vent pipe, use the vent

pipe manufacturer’s PVC adapter when connecting to

the concentric vent attachment.

Do not connect any other appliance to the vent pipe or

multiple boilers to a common vent pipe.

3. After the assembly has been positioned in the roof opening and

all supports have been attached, install a bird screen (purchased

separately if not included with the kit) and rain cap as follows:
a. Place the bird screen on the end of the inner pipe as in Fig-

ure 58, page 47.

b. Cement the rain cap in place.

Figure 56

Vertical termination — 3” PVC concentric

— single or multiple boilers

Figure 57

3” PVC concentric termination supports

Advertising