Direct vent — boiler room air openings, Gv90, Boiler manual – Weil-McLain GV90+ User Manual

Page 36

Advertising
background image

Part number 550-142-054/0411

GV90+

gas

-

fired

water

boiler

— Boiler Manual

36

Figure 42

Combustion and ventilation air openings for GV90+ Direct Vent installations

The GV90+ boiler CANNOT be in the same space with other appliances if clearances around the GV90+ are less than

the recommended service clearances shown in Figure 2, page 6.

Air openings

The required air opening sizes below are FREE AREA,

after reduction for louver obstruction. Note the ex-

ception below for large spaces.

GV90+ boiler

WITH other

appliances in room

GV90+ boiler

WITHOUT other

appliances in room

TWO

openings, each at least:

1

square inch per 1,000 Btuh

of all other appliances in the room

NO

openings are required if the

boiler installation provides at least the

recommended service clearances

shown in Figure 2, page 6.

If the space is smaller than Fig-
ure 2, page 6, provide openings
ONLY as shown on page 7 and
Figure 4, page 7

.

TWO

openings, each at least:

1

square inch per 4,000 Btuh

of all other appliances in the room

— OR —

ONE

opening **, each at least:

1

square inch per 3,000 Btuh

of all other appliances in the room

TWO

openings, each at least:

1

square inch per 2,000 Btuh

of all other appliances in the room

— OR —

ONE

opening **, each at least:

1

square inch per 3,000 Btuh

of all other appliances in the room

TWO

openings, each at least:

1

square inch per 4,000 Btuh

of all other appliances in the room

— OR —

ONE

opening **, each at least:

1

square inch per 3,000 Btuh

of all other appliances in the room

** NOTICE:
Requirements for using the SINGLE air opening
option.

A single combustion air opening can be used for cases b, c or d above (GV90+ with

other appliances in room only), sized as listed, provided that:

The single opening must communicate directly to the outdoors or to a space that

communicates directly with outdoors (NOT to an interior space).

The top of the opening must be within 12 inches of the ceiling.

The free area of the opening must be at least equal to the sum of the areas of all

equipment vent connectors in the space.

SPECIAL EXCEPTION FOR LARGE SPACES
(GV90+ WITH other appliances in room only):

NO combustion air openings are needed when the boiler (and other appliances) are

installed in a space with a volume NO LESS than 50 cubic feet per 1,000 Btuh of all ap-

pliances in the space. That is, total the input of all appliances in MBH (1,000’s of Btuh),

then multiply this total times 50. The building MUST NOT be of tight construction.
Example: For a total input of 500 MBH (500,000 Btuh), the minimum volume would be

50 x 500 = 25,000 cubic feet (3,125 square feet if ceiling height is 8 feet).

DIRECT VENT — Boiler room air openings