Figure 27 rectifier and shelf numbering, Figure 29 input conduit locations – GE Industrial Solutions H5692448 Power Systems Infinity M1 (NE-M) User Manual
Page 24
NE-M
Installation Guide
H5692448
CC848815325 r06 May 2013
24
Figure 27 Rectifier and Shelf Numbering
Figure 28 Rectifier Dual Feed Jumper Positions – ac feeds only
Step
Action
1
Route and attach conduit or other commercial fittings.
Input power is connected to terminal blocks located
within the Input Panel. Terminal blocks for up to six
shelves may be present.
AC Bridging jumpers
• AC inputs – jumpers may be installed to power
two rectifier positions with one AC feed.
• PV inputs - Do not apply AC bridging jumpers.
Each PV feed must power a single rectifier.
Figure 26 shows Input Power Terminal Block Positions.
Figure 29 Input Conduit Locations
AC input feeds to rectifier pairs?
Yes – go to Step 2.
No – go to Step 4.
12
shipped with each system
Input Panel