Install battery trays, Figure 33 battery trays, Table 2 conduit size - input feed – GE Industrial Solutions H5692448 Power Systems Infinity M1 (NE-M) User Manual

Page 26

Advertising
background image

NE-M

Installation Guide

H5692448

CC848815325 r06 May 2013

26

Table 2 Conduit Size - Input Feed

Rectifiers

per

Conduit

Rectifiers

per feed

Min.

External

Breaker

Wire

Gage

Minimum Conductor Rating

13

Conductors per

Conduit

14, 15

Conduit

Size

AC Feeds – All rectifiers except NE075AC48xxxx

7

1

20A

10

40A*0.87*0.5 = 17.5A Rating

15 (50% derated)

1”

10

1

20A

10

40A*0.87*0.4 = 17.5A Rating

21 (40% derated)

1-1/2”

6

2

40A

8

55A*0.87*0.8 = 38.3A Rating

7 (80% derated)

1”

8

2

40A

6

75A*0.87*0.7 = 45.6A Rating

9 (70% derated)

1-1/2”

AC Feeds –NE075AC48xxxx Only

6

1

30A

6

75A*0.87*0.5 = 32.6A Rating

13 (50% derated)

1”

10

1

30A

4

95A*0.87*0.4 = A Rating

21 (40% derated)

1-1/2”

6

2

60A

A*0.87*0.8 = 3A Rating

7 (80% derated)

1”

8

2

60A

*0.87*0.7 = A Rating

9 (70% derated)

1-1/2”

PV Feeds

7

1

15A/300Vdc

10

40A*0.87*0.5 = 17.5A Rating

15 (50% derated)

1”

10

1

15A/300Vdc

10

40A*0.87*0.4 = 17.5A Rating

21 (40% derated)

1-1/2”

Install Battery Trays

Optional battery trays are suitable for use with general trade batteries such as Northstar Battery NSB110FT and

NSB170FT.

Step

Action

1

Position the battery tray in the frame with frame

mounting brackets on both front and back of frame as

shown.
Secure with provided screws.

Torque to 35 in-lb – 5/16” socket.

Figure 33 Battery Trays

13

Based on NEC 90°C Conductor, Number of Wires in Conduit, and 45°C Ambient

14

Including 1 ground per conduit

15

AC and PV feeds must be in separate conduits.