32

Direct to Battery Bus Connection

Step

Action

Direct battery bus connections are not factory installed.

1

Run cables from the battery buses to the tray

mounted battery strings.

Insulate the battery end of the cable.

2

Make battery cable connections to the system

battery bus per the procedure in the External

Battery Connection section.

3

Connect Battery Cable (hot side)

48V Battery Strings


Connect the 2/0 cable between the V- post of the

left-most battery and the input bus of the

disconnect switch.

Torque to battery manufacturer’s specification.

Figure 45 Battery Cable Direct -48V

24V Battery Strings


Connect the 2/0 cable between the V- post of the

right-most battery of the left string and the input

bus of the left disconnect switch.

Connect the 2/0 cable between the V- post of the

right-most battery of the right string and the

input bus of the right disconnect switch.

Torque to battery manufacturer’s specification.

Figure 46 Battery Cable Direct +24V

4

Connect Battery Return Cable (ground side)

48V Battery Strings


Connect the factory-wired battery return cable to

the V+ post of the right-most battery.

Torque to battery manufacturer’s specification.

Figure 47 Battery Return Cable Direct -48V