Verify installation, Figure 57 bolt-in breakers – GE Industrial Solutions H5692448 Power Systems Infinity M1 (NE-M) User Manual

Page 38

Advertising
background image

NE-M

Installation Guide

H5692448

CC848815325 r06 May 2013

38

Bolt-In Breakers

Figure 57 Bolt-In Breakers

1

Assemble load bus bar to breaker using provided screws, nuts, and washers.

Torque nuts to 240 in-lb – 9/16” socket.

2

Install alarm wire set.
Alarm wire set daisy chains from Plant Wire Set through all bolt in breakers.

1. Connect wire set to breaker pins 8 & 9.
2. Connect wire set to plant wire set (if first bolt in breaker) or to previous breaker.

3

Install Bolt-in breakers into specified position using provided hardware.

3. Install standoffs - torque to 65 in-lb.
4. Secure load bus to standoffs with flat head screws - torque to 65 in-lb – 7/16” socket.
5. Secure breaker to load bus with hex screws and washers - torque to 240 in-lb – 9/16” socket.

4

Secure Load Cable connections with provided hardware (per cable):
(2) 3/8-16 nut

(2) 3/8-inch lock washer

(2) 3/8-inch flat washer

Torque to 240 in-lb - 9/16” socket.

5

Verify polarity (using a voltmeter) of the voltage between the Return bus and the distribution input bus.

6

Verify wiring polarity at the input of the load equipment.

Leave breaker switches in the OFF position until the load equipment is ready to be energized.

Re-secure Retainer Cover

1

Re-secure hinged retainer cover if removed.

Verify Installation

Perform the following verification checklist after installation of batteries and wiring:

Step

Action

1

Verify cabinet is properly grounded (using Digital Multimeter (DMM)).

2

Verify the AC equipment ground is properly connected.

3

Verify the correct ground cable gauge is used. Use the standard grounding principles for the office.

to Other Breakers

or Plant Wire Set

Shunt

to Pins

8 & 9