Install Converters

Repeat the above steps for converters; use converter-only slots first if provided. These are the lowest mounted

shelves and labeled “Converter Only”.
For more information on rectifiers and converters, see the Troubleshooting section.

Install Battery Voltage Temp (VT)-Probes

QS873A VT Probes can be used with or without mid-string voltage monitoring. Only one probe is required to allow

the battery slope thermal compensation function to be utilized.
Refer to the Galaxy Pulsar Plus Family Product Manual for installation instructions.

Install Aux Display (NE830A) Alarm Cable (Optional)

The optional NE830 Aux Display, when ordered separately, will require field installation. To do so, perform the

following steps:

Step

Action

Is the NE830A factory installed?

No – go to Step1.

Yes – go to Step4.

1

Connect and wire to field installed NE830A.

2

Install wiring per NEC and local rules for Class 3 circuits.

Note: Cable supplied with NE830A is suitable for Class 3 circuits.