Connect battery probes, Verify battery bus voltage and polarity, Figure 51 external shunt panel battery connections – GE Industrial Solutions H5692448 Power Systems Infinity M1 (NE-M) User Manual

Page 34: Figure 52 battery bus connections

Advertising
background image

NE-M

Installation Guide

H5692448

CC848815325 r06 May 2013

34

Step

Action

3

Battery Cable Connections to External Shunt

Panel

(Battery only, not Return)

(see Step 4 for Battery Return Connections)

Secure Battery Cable lugs with hardware (per cable):

(2 sets) nut, lock washer, and flat washer.

If required by local code or practice, treat with an

oxidation inhibitor such as NO-OX.

Torque 1/4 -20 nuts to 65 in-lb - 7/16” socket.

Torque 3/8-16 nuts to 240 in-lb - 9/16” socket.

Figure 51 External Shunt Panel Battery Connections

4

Battery Return Cable Connections (all)

and

Battery Cable Connections without External

Shunt Panel

See Step 3 for Battery Cable Connections to

External Battery Panel.


Secure Battery Cable lugs with hardware (per cable):

(2 sets) 3/8-16 nut, lock washer, and flat washer.


If required by local code or practice, treat with an

oxidation inhibitor such as NO-OX.


Torque to 240 in-lb - 9/16” socket.


Note: Battery Landings are 3/8” studs on 1”

centers spaced 1.25” apart (11 landings).

For lugs wider than 1.25”, use every other

connection (6 total).

Figure 52 Battery Bus Connections

Connect Battery Probes

Battery probes are optional controller peripherals. See the See the controller manual and instructions accompany the

options.

Verify Battery Bus Voltage and Polarity

Step

Action

CAUTION

:

Equipment Damage

Do not install rectifiers before battery bus voltage and polarity has been verified.

Rectifiers and system damage will result from incorrect battery bus polarity.

The damage may not be immediately evident.

External Battery Connections

Battery Return

All

Battery

(without External

Shunt Panel)

Advertising