NE-M

Installation Guide

H5692448

CC848815325 r06 May 2013

28

Step

Action

Notes:

1. Steps show four 12V batteries per shelf – one string of -48V batteries.
2. 1 Battery Disconnect Switch per shelf shown.

Other options
• 2 Battery Disconnect Switches per shelf (left and right) (two 24V battery strings per shelf)
• 1 or 2 Anderson Disconnects per shelf
• No Battery Disconnect Switches or Anderson Disconnects - Battery cables shipped loose.

1

Place four batteries on each battery tray.

Figure 35 Place Batteries

2

Position three Battery Spacers between the

batteries.

3

48V Battery Strings:

Interconnect three inter-cell bus bars to

configure one 48V battery string per the

battery manufacturer’s instructions.


24V Battery Strings:

Interconnect two inter-cell bus bars to

configure two 24V battery strings per the

battery manufacturer’s instructions.

Figure 36 Battery Inter-Cell Bus Bars

4

Attach the battery securing top rail.

External Batteries

Step

Action

1

Place batteries on battery trays, battery stands, or other satisfactory supporting surface and interconnect per

manufacturer’s instructions to create 24V or 48V strings as required.

Is an external disconnect switch being used?

Yes – go to Step2.

No – Finished.

2

Physically mount switch to an appropriate place and ensure it is in the OFF position prior to making any

connections

3

Connect the battery hot conductor(s) to the line side of the disconnect switch and torque connection per

manufacturer's specification.

4

Connect the load side conductor to the disconnect switch and torque connection per manufacturer's

specification.

Spacer

Inter-cell

bus bars

Middle bus bar for

48V systems only

Top Rail