Examples, S/r coil (break contact) – Rockwell Automation 1760-xxxx Pico Controller User Manual User Manual

Page 155

Advertising
background image

Publication 1760-UM001D-EN-P - September 2005

Retention 7-5

Examples

S/R Coil (Break Contact)

Task:
In your application you need to remember whether a screw was
inserted or not. When your machine powers up, it is important that a
screw that has already been screwed in place is not screwed in again -
otherwise there could be permanent damage to the workpiece.

Contacts and relays used:

Circuit diagram (part):

Signal diagram:

The ’Make Contact’ state is always displayed in the Signal diagram.

U = Supply voltage

The break contact of the retentive marker M14 is used. No enabling
time is required for output Q2.

Coil

Function

I3

Screw detected

Q2

Enable pulse to drive screw

M8

Enable screw command

M14

Screw present (retentive)

M9

Workpiece transported away, reset M14

M8-M14------{Q2

I3------SM14

M9---------RM14

U

M8

Q2

I3

M9

M14

Advertising