Metrohm 820 IC Separation Center User Manual

Page 22

Advertising
background image

2 Installation

819 IC Detector / 820 IC Separation Center

14

In one-channel operation, the 818 IC Pump, 820 IC Separation Center

and 819 IC Detector are best stacked on top of one another in this or-

der.
In two-channel operation (2.820.0X20 IC Separation Center), the opti-

mum arrangement (1, 2 or 3 towers) depends on the laboratory space

available. However, the 818 IC Pumps should be set up at the very bot-

tom and the 819 IC Detectors at the very top.

To ensure that the arrangement of pumps and detectors for the two

channels A and B is clearly apparent in two-channel operation, it is

advantageous to mark the instruments. The 6.2248.000 Magnetic

plate is enclosed with the 819 IC Detector for this purpose. It can be

cut to the desired size, labeled (e.g. with "A" or "B") and affixed to the

appropriate instrument.

Advertising
This manual is related to the following products: