In order to operate a 2-channel Separation Center with chemical sup-

pression a 2.833.0020 IC Liquid Handling Suppressor Unit is addition-

ally required. For this reason the 1.753.0100 Suppressor Module of the

833 IC Liquid Handling Suppressor Unit is placed on the floor of the in-

ner compartment of the Separation Center (see Fig. 25).
In a 2-channel system with suppressor module the first IC separating

column, just like in a 1-channel system, is connected on the left-hand

side to injection valve A and detector block A (similar to Section 2.9.5,

Fig. 21). Components of this channel are shown in dark gray in Fig. 25.
The second column, just like in a 1-channel system with suppressor

module (see Section 2.9.7 and Fig. 23), is connected on the right-hand

side to injection valve B and detector block B. The installation of the 833

IC Liquid Handling Suppressor Unit is described in the 833 Instructions

for Use; connection to the 2.820.0X20 Separation Center is described

there in detail in Section 5. Components of this channel are shown in

light gray in Fig. 25.

2.9.9

Leak testing and conditioning

Before sample solutions can be injected in the IC system, the entire

system must be tested for leaks and then conditioned with eluent until

the baseline is stable. Proceed as follows:

1 Switch on instruments

Switch on 818 IC Pump at mains switch.

Switch on 819 IC Detector at mains switch 2.

The 820 IC Separation Center is normally supplied via

the 819 IC Detector, see also Section 2.4.2.

If present, switch on 833 IC Liquid Handling Pump Unit at the

mains switch.

If present, switch on 830 IC Interface at the mains switch.

Switch on PC and start «IC Net», load a system correspond-

ing to the device configuration or create a new one (see «IC

Net» Instructions for Use).

Start the system with

Control/Startup hardware

. The 818 IC

Pump and, if present, the 833 IC Liquid Handling Unit will

start to run, and the baseline will be shown in the chroma-

togram window.