For operation of the suppressor m – Metrohm 820 IC Separation Center User Manual

Page 51

Advertising
background image

2.9 Separating columns and suppressor module

819 IC Detector / 820 IC Separation Center

43

48 PEEK capillary (6.1831.010)

to 818 IC Pump

49 Pulsation dampener (6.2620.150)

50 Column connection capillary

PEEK capillary 6.1831.010

51 Injection valve

53 Separating column

56 Detector block

57 Inlet capillary for detector block

fixed mounting

58 Mounting rail

59 Column holder (6.2027.0X0)

60 Capillary for syringe 13

PEEK capillary, fixed mounting

61 Sample loop (6.1825.210)

20

µ

L, PEEK, fixed mounting

62 Inlet capillary for injector

PEEK-Capillary 6.1831.010

63 PTFE aspirating tube

fixed mounting

64 Suppressor inlet capillary for elu-

ent

65 Suppressor inlet capillary for

H

2

SO

4

66 Suppressor outlet capillary for

H

2

SO

4

67 Suppressor outlet capillary for H

2

O

68 Suppressor inlet capillary for H

2

O

69 Suppressor outlet capillary for elu-

ent

70 Suppressor module

71 Coupling (6.2744.040; PEEK)

1 Connect column to injector

Remove end caps from column 53

without column heating:

Screw inlet end of separating column 53 (note flow direction)

to column connection capillary 50 mounted on the injector.

with column heating:

Prepare column heating according to Section 2.9.2 and

screw column connection capillary 50 (see Fig. 20) with a

compression fitting to injection valve 51.

With precolumn:

Install precolumn according to the supplied leaflet between

inlet of the separating column and the injection valve.

2 Rinse column

Place a beaker beneath the column outlet.

Start 818 IC Pump in «IC Net» with suitable flow (see leaflet of

the column) and rinse column for ca. 10 min with eluent.

Stop 818 IC Pump.

Advertising
This manual is related to the following products: