Metrohm 820 IC Separation Center User Manual

Page 44

Advertising
background image

2 Installation

819 IC Detector / 820 IC Separation Center

36

1 Open column heating

Open the two knurled screws 36 and remove cover 37 of the

column heating.

2 Prepare column heating

Unscrew the six screws of holder plate 54 and remove the

holder plate from the column heating.

Lead column connection capillary 50 (approx. 1 m PEEK-

Capillary 6.1831.010) through feedthrough 41 in the column

heating and place in the recesses in capillary prewarmer 55

as shown in Fig. 20.

Then screw down holder plate 54 again with the six screws.

Cut off a further piece of 6.1831.010 PEEK Capillary, lead this

Capillary 52 out through feedthrough 35 and provide its inner

end with a 6.2744.010 Compression fitting 43.

If not much space is available then the

6.2744.070 PEEK compres-

sion fitting short contained in the standard equipment can also be

used for attaching the PEEK capillary.

3 Insert separating column

Press separating column 53 into the holding clips and fasten

the column connection capillary 50 to the separating column

inlet (bottom) with a 6.2744.010 Compression fitting 43.

Fasten capillary 52 from the detector to the outlet of the

separating column (top) with a 6.2744.010 Compression fit-

ting 43.

4 Close column heating

Screw down cover 37 on to the column heating again with

the two knurled screws 36.


Advertising
This manual is related to the following products: