11 power-on debugging, Power-on debugging – FUJITSU SOFTUNE F2 MC-16 User Manual

Page 209

Advertising
background image

195

CHAPTER 2 DEPENDENCE FUNCTIONS

2.3.11

Power-on Debugging

This section explains power-on debugging by the emulators for the MB2147-01.

Power-on Debugging

Power-ON debugging refers to the operation to debug the operating sequence that begins when the power to

the target is switched on.

For products with a dedicated power-on debugging terminal, the MB2147-01 emulator can debug the

sequence performed immediately after power-on. The following functions are available:

Code break

Data monitoring break

Data break

Sequencer and event

Trace trigger

Trace measurement

Coverage measurement

The power-on debugging procedure is described below:

- Set the DIP switch on the adapter board mounted in the upper part of the emulator.

- Turn on the target board and emulator main unit.

- Launch Workbench to start debugging.

For debugging, set hardware breaks, etc.

- To start a power-on debugging, run [Execute] - [Power-ON Debug] menu.

Input the lower limit value of the monitoring voltage from the [User Power Monitor Voltage] dialog

box to display PON in the input status bar.

- Run the program.

- Turn the target board off while running and then back on.

- Conduct debugging.

- To terminate the power-on debugging, run [Execute] - [Power-ON Debug] menu.

Advertising