5 powerlink connection, Powerlink connection, Powerlink connection ( 30) – Lenze E94AYCEP User Manual

Page 29: 5installation

Advertising
background image

Lenze · E94AYCEP communication module (POWERLINK MN/CN) · Communication Manual · DMS 6.0 EN · 02/2014 · TD17

30

5

Installation

5.2

Electrical installation

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5.2.5

POWERLINK connection

• The POWERLINK is wired using the two RJ45 sockets X211 and X212.
• If possible, do not wire more than 10 nodes in a row in a network line.
• In case of more than 10 nodes you should deactivate the automatic calculation of the hub level

in the »Engineer« and enter it manually to increase the performance.

• With a cycle time of 1 ms, 25 nodes can be operated.

• The number of nodes can be increased if the POWERLINK cycle time is increased as well.

• You can use a standard Ethernet patch cable to connect the communication module to the

POWERLINK fieldbus.

Ethernet cable specification

( 32)

• The installation and removal of the Ethernet cables is optimised for the use of connectors in

accordance with the "Automation Initiative of German Domestic Automobile Manufacturers"

(AIDA).

Pin assignment of the RJ45 sockets

Tip!
The POWERLINK interfaces feature an auto-MDIX function. This function adjusts the

polarity of the RJ45 interfaces so that a connection can be established irrespective of the

polarity of the opposite POWERLINK interface and irrespective of the type of cable used

(standard patch cable or crossover cable).

Note!

To prevent the RJ45 socket from being damaged, insert or remove the Ethernet cable

connector straight (at a right angle) into or from the socket.

RJ45 socket

Pin

Signal

E94AYCXX004C

1

Tx +

2

Tx -

3

Rx +

4

-

5

-

6

Rx -

7

-

8

-

Advertising