7 process data transfer, Process data transfer, 7process data transfer – Lenze E94AYCEP User Manual

Page 42

Advertising
background image

7

Process data transfer

43

Lenze · E94AYCEP communication module (POWERLINK MN/CN) · Communication Manual · DMS 6.0 EN · 02/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

7

Process data transfer

POWERLINK transmits process data, parameter data, configuration data and diagnostic data

between the Managing Node and the Controlled Nodes. Depending on their time-critical behaviour,

the data are transmitted via different communication channels.

• Process data are transmitted via the process data channel.
• Process data serve to control the Servo Drive 9400.
• The transmission of process data is time-critical.
• Process data are cyclically transferred between the Managing Node and the Controlled Nodes

(permanent exchange of current input and output data).

• The Managing Node can directly access the process data. In the PLC, for instance, the data are

directly assigned to the I/O area.

• 1 ... 10 process data words (16 bits/word) can be received:

PDO_RX01 (

C13231

/

C14231

) ... PDO_RX10 (

C13240

/

C14240

).

• 1 process data word can be sent:

PDO_TX01 (

C13531

/

C14531

)

• Process data are not saved in the Servo Drive 9400.
• Process data are e.g. setpoints, actual values, control words, and status words.

Advertising