Commissioning

6.4

Initial switch-on

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Initial switch-on and diagnosing

1. Switch on the Servo Drive 9400 and check whether it is ready for operation using the

diagnostic LEDs of the communication module.

• Red diagnostic LEDs must not be on.
• The following signalling should be visible:

2. If not already done, load the POWERLINK configuration into the Servo Drive 9400.
3. Repeat steps 1. and 2. for all POWERLINK nodes.
4. Start the POWERLINK network.

The network starts automatically if you set the Managing Node last.
Otherwise there are two options:

• Switch off the network nodes and switch them on together or
• execute a fault reset at the Managing Node (Node ID = ’240’).

5. Check the POWERLINK network again using the diagnostic LEDs of the communication

module.
The following signalling should be visible:

LED

Colour

Status

Meaning

MS

Green

On

Module Status

Module status displays ( 51)

DE

-

Off

Device Error

X211

Green

On

LED is lit if a connection to the node has been established.

Status displays at the RJ45 sockets (X211, X212) ( 53)

X212

Green

On

LED

Colour

Status

Meaning

MS

Green

On

Module Status

Module status displays ( 51)

ME

-

Off

Module Error

BE

-

Off

Bus Error

DE

-

Off

Device Error

BS

Green

On

Bus Status

Fieldbus status displays ( 52)

X211

Green

On

LED is lit if a connection to the node has been established.

Status displays at the RJ45 sockets (X211, X212) ( 53)

X212

Green

On