8monitoring – Lenze E94AYCEP User Manual

Page 48

Advertising
background image

8

Monitoring

8.2

Monitoring functions of the Controlled Node

49

Lenze · E94AYCEP communication module (POWERLINK MN/CN) · Communication Manual · DMS 6.0 EN · 02/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Settings

Monitoring function

Description

EPL frame error (CRC)

Weighted number of received faulty frames

• This error can occur due to ver strong EMC interferences or by non-

POWERLINK-compliant nodes.

• Monitoring threshold:

C13131/3

/

C14131/3

• Monitoring response:

C13891/4

/

C14891/4

EPL-Rx PDO contents

This monitoring response defines the way the cyclic process data (PDO) are

forwarded from the POWERLINKnetwork to the standard device/application

in the event of an error. An error has occurred if no valid process data is

received and the "POWERLINK synchronisation loss" monitoring function is

activated. The following settings are possible with

C13885

/

C14885

:

• 0: The valid data received last remains.

• 1: All data is set to the value "0".

EPL synchronisation loss

This monitoring detects a failure of the Managing Node by means of the

number of POWERLINK cycles failed. This monitoring is independent of the

setting for the

Drive synchronisation ( 41)

.

• Monitoring threshold:

C13127/3

/

C14127/3

• Monitoring response:

C13891/3

/

C14891/3

Advertising