Verify switch operation – Rockwell Automation 1783-BMxxx Stratix 5700 Ethernet Managed Switches User Manual User Manual

Page 34

Advertising
background image

34

Rockwell Automation Publication 1783-UM004E-EN-P - June 2014

Chapter 2 Switch Installation

To remove the card, push it in and let it pop out via the spring-loaded

mechanism. Grasp the card top and pull it out. Place it in an antistatic
bag to protect it from static discharge.

4. Close the guard door and fasten the captive screw by using a screwdriver to

keep the door in place.

Verify Switch Operation

Before installing the switch in its final location, power on the switch, and verify
that the switch powers up.

The time required for the switch to start up is directly related to your switch
configuration. Start time is negatively affected by such things as the following:

Spanning Tree Learning mode
Number of files or images in onboard flash memory

32272-M

Setup

EIP

Net

EIP

Mod

IN1

IN2

OUT

Alarm

Advertising