Chapter 2 Switch Installation
• To remove the card, push it in and let it pop out via the spring-loaded
mechanism. Grasp the card top and pull it out. Place it in an antistatic
bag to protect it from static discharge.
4. Close the guard door and fasten the captive screw by using a screwdriver to
keep the door in place.
Verify Switch Operation
Before installing the switch in its final location, power on the switch, and verify
that the switch powers up.
The time required for the switch to start up is directly related to your switch
configuration. Start time is negatively affected by such things as the following:
• Spanning Tree Learning mode
• Number of files or images in onboard flash memory