Switch Installation Chapter 2

To test the switch, follow these steps.

1. Apply power to the switch.

To apply power to a switch that is directly connected to a DC power
source, locate the circuit breaker on the panel board that services the DC
circuit, and switch the circuit breaker to the ON position.

2. Verify the start-up sequence.

When you power on the switch, it automatically begins a start-up routine.
The System status indicator blinks green as the IOS software image loads.
If the routine fails, the System status indicator turns red.

3. After successfully running this test, do the following:

a. Turn off power to the switch.
b. Disconnect the cables.
c. Decide where you want to install the switch

IMPORTANT

Start-up failures are usually fatal to the switch. Contact your
Rockwell Automation representative immediately if your switch does
not complete the start sequence successfully.

IMPORTANT

You can disable boot fast and run the Power-on Self Test (POST) by

using the IOS CLI. See the appropriate documentation at

http://www.Cisco.com

for more information.