Rockwell Automation 1783-BMxxx Stratix 5700 Ethernet Managed Switches User Manual User Manual

Page 58

Advertising
background image

58

Rockwell Automation Publication 1783-UM004E-EN-P - June 2014

Chapter 2 Switch Installation

When determining where to place the switch, observe these guidelines:

Airflow around the switch is unrestricted. To prevent the switch from

overheating, observe the following minimum clearances:

Top and bottom: 50.8 mm (2.0 in.)
Sides: 50.8 mm (2.0 in.)
Front: 50.8 mm (2.0 in.)

For 10/100 ports and 10/100/1000 ports, the cable length from a switch

to an attached device cannot exceed 100 m (328 ft).

The copper cable length from a switch to an attached device cannot exceed

the distance specified in

Appendix C

.

For maximum noise immunity, X-code shielded cables must be used on

M12 uplink ports. For recommended M12 media, refer to

http://

ab.rockwellautomation.com/Connection-Devices/EtherNet-Media

.

Temperature surrounding the unit does not exceed 60 °C (140 °F).

Clearance to front and rear panels meets these conditions:

Front-panel status indicators can be easily read.
Access to ports is sufficient for unrestricted cabling.
Front-panel direct current (DC) power connectors and the alarm relay

connector are within reach of the connection to the DC power source.

Cabling is away from sources of electrical noise, such as radios, power lines,

and fluorescent lighting fixtures.

Connect the unit to only an IP67-rated power supply. Rockwell

Automation offers a Bulletin 1607 IP67-rated power supply to provide
24V DC power to the switch.

ATTENTION: Do not wire more than 1 conductor on any single terminal.