Rockwell Automation FactoryTalk Metrics User Guide User Manual
Page 148

Chapter 4 Automated Configuration
The Shortcut Verifier dialog box appears.
The dialog box displays the shortcut verification status.
For details on messages that may appear in the dialog box, click
How to use the Shortcut Verifier.
16. Click Close.
17. At the bottom of the window, click OK.
In this step you will import the FactoryTalk Metrics UDT to your
ControlLogix program so that the FactoryTalk Metrics
Configuration Tool can use in FactoryTalk Metrics the data tags
that are defined in the UDT.
To import the UDT to the controller project:
1. Go to Start > All Programs > Rockwell Software > Studio
5000.
The Rockwell Software Studio 5000 window appears.
2. Under Open, click Existing Project.
The Open Project dialog box appears.
3. Navigate to and select the project file (.acd) of the controller
that you want to synchronize with FactoryTalk Metrics.
Importing the FactoryTalk
Metrics UDT to the
ControlLogix Controller
148
Rockwell Automation Publication PLTMT-UM001M-EN-P-June 2014