Rockwell Automation FactoryTalk Metrics User Guide User Manual
Page 265
Advertising
![background image](/manuals/581334/265/background.png)
Report Data Sources Appendix A
• Shift information.
• The number of the part being built and the ideal cycle time for
that part number.
• The number of parts built (good parts, scrap parts, and total
parts).
• The value for each configured user-defined summarization
criterion.
Rockwell Automation Publication PLTMT-UM001M-EN-P-June 2014
265
Advertising