Schedule a report object – Rockwell Automation FactoryTalk Metrics User Guide User Manual
Page 228
Advertising
![background image](/manuals/581334/228/background.png)
Chapter 7 Advanced Reporting Topics
To schedule a report object to be run at a later time:
1. Open the Configuration Console.
2. On the Configure menu, click Scheduled Report Objects.
The Scheduled Report Objects dialog box appears.
3. Click Add.
The Schedule Wizard appears.
4. On the Report Object Selection wizard page, select a report
data source, a report object, and an optional filter.
The preview of the selected data appears.
5. Click Next.
The Description and Frequency page appears.
6. In the Task Description box, type the description of the task
that will be performed.
For this example, type
Workcell Production Scheduled Task.
Schedule a Report Object
228
Rockwell Automation Publication PLTMT-UM001M-EN-P-June 2014
Advertising