Step 5
inspection ran
successfully; that is, the
part was found.
4. Click on the Coordinate Tool (COORD_1) tab and make sure that the checkmark next
to the X-Coordinate value checked. Enter 0 (zero) in the Min column and a large number
(e.g., 1000) in the Max column.
Note:
These settings will cause the Test tool to pass all resulting X values, but fail
if the X value is invalid (that is, if the part is not found).
5. Uncheck other values.
6. Click the Back button.
7. Cleck the Next button to exit the Test Tool configuration.
Main Tasks to Complete
Step 6
In the PresencePLUS GUI, click the Go To Run button. When prompted to save the
inspection:
Save and Start Inspection
1. Enter a name in the Inspection Name field.