Operator’s manual, 10” vt aux input/function assignment – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 127

Advertising
background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

SYSTEM CONFIGURATION / 119

10” VT AUX INPUT/FUNCTION ASSIGNMENT

The Auxiliary Input/Function Assignment screen configures the system’s
master switch input to the TECU so that it will work with the IntelliAg control
function.

IMPORTANT: On initial powerup, a Master Switch Assignment alarm

activates requiring a switch assignment. If the master
switch is not configured, the Master Switch Assignment
alarm will activate at each power cycle until an auxiliary
assignment is made and will default to the Master Switch
button to activate auxiliary inputs.

An installed master switch located in the tractor cab is the preferred method
for auxiliary input; however, a Master Switch button will be assigned and
appear on the Work Screen if no physical switch assignment is made.

Figure 75
Aux Input/Function Assignment Screen

NOTE: For Virtual Terminals other than

DICKEY-john, refer to the
manufacturer’s VT operator’s
manual for auxiliary
assignment.

To assign the Master Switch to the IntelliAg:

1. Press the VT button.
1. Press the Auxiliary Assignment button.
2. At the Function box, use the right or left arrows to select the desired

function (Control Channel icon).

3. At the Input box, use the right or left arrows to select the desired input

(Tractor ECU master switch).

4. Press the Enter button to accept.

No Auxiliary Inputs Available appears on the screen if the Tractor ECU is
not connected. When assigned, this line will disappear.

No Auxiliary Functions Available appears on the screen if the IntelliAg
system is not connected. When assigned, this line will disappear.

Advertising
This manual is related to the following products: