Operator’s manual, 20 / installation, Optional – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 28: Figure 15 implement harness

Advertising
background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

20 / INSTALLATION

Figure 15
Implement Harness

WSMT

MODULE

PLANTER/DRILL

CONTROL

.

Connect to next module
harness or implement
extension harness
(See Figure 15)

(Connect CAN terminator
if this is the last module
on the CAN bus)

WSMT Actuator Harness
46798016X

WSMT Module Harness
46798085X

Implement CAN Breakaway Harness
46798013X (multiple lengths)

Connect to
Cab Harness

Connect harnesses and accessory devices as
shown. Verify that PWM Solenoid Valves have a
properly connected feedback sensor.

Standard Dj SE Style
Planter Harness

NOTE: Connect the WSMT Actuator Harness
and the Dj Planter Harness to the mating
connectors of the WSMT Module Harness

Application Rate

Sensors x 4

(Channel 1-4 Feedback)

Labeled FB1-FB4

PWM Solenoid

Valves

Channel 1-4

Control

Labeled PWM 1-PWM 4

Hopper Level Sensor

Labeled HOPPER 1

Radar Speed Sensor
Labeled GND Speed

Fan/Shaft RPM Sensor
Labeled RPM1 or

Implement Lift Sensor
Labeled IMP LIFT
If no Implement Lift
Sensor is used, connect
the IMP LIFT leads
together

Remote
Test Swtich

Servo Valve
Connectors

Accessory Sensor
Connection

Air Pressure
Sensor 46682-0920S1

464820510

Switch 1 (Output 1)

Switch 2 (Output 2)

Switch 5

Switch 6

464820510

Switch 3

Switch 4

Planter
Output
Module

464820510

467983500

46798200051

OPTIONAL

46798081S1

Advertising
This manual is related to the following products: