Default, Operator’s manual, Up down default clear ok – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 129: Cancel

Advertising
background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

SYSTEM CONFIGURATION / 121

Figure 77
Auxiliary Input/Function Setup Screen

3. Navigate to the configuration screen by pressing the Auxiliary Input

Setup button.

4. Press the Default button. A Master Switch Connection icon will appear

on the screen indicating that the master switch is to be connected to
the tractor cab harnesses’ master switch connector (refer to
(

Figure 78

).

5. Press the OK button to save the configuration and return to the Aux

Input/Function Setup screen.

6. Press and hold the ESC button for one or more seconds to return to

the Virtual Terminal Setup screen.

Figure 78
Aux Input Configuration Screen

2

4

4

2

2

1

2

3

2

4

4

2

2

1

2

3

Cancel

X

PDC

Aux Input
Setup
softkey

Default

Up

Down

Default

Clear

OK

The Master Switch Connection
icon may appear automatically on
this screen, or may appear after
the DEFAULT softkey has been
pressed.

Aux

Cancel

Advertising
This manual is related to the following products: