Operator’s manual, Work screen configuration – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 131

Advertising
background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

SYSTEM CONFIGURATION / 123

WORK SCREEN CONFIGURATION

A data item can be placed in any position by selecting the location on
Screen Configuration
. The display is functionally divided into 2 columns
and 6 rows.

1. Press the Work Screen button to access Screen Configuration.

– Any data item can be placed in any position.
– Duplicate data items can be configured on a single display if

desired.

– Up to three display screens can be configured.
– Some items selected for the work screen will display on one entire

row.

After these values are selected, the new settings display on the configured
work screens.

Figure 80
Work Screen Configuration Screen

Refer to the Data Items section for a detailed description of each item and
the associated display images.

In order to configure the second and third display screens, select the Next
Screen
button.

BARGRAPH SETUP

Bar graph setup allows customization of the rows being monitored and
displayed on the Main Work screen. A maximum of 2 lines and 24 columns
can display. Default displays 1 line and 24 columns.

Advertising
This manual is related to the following products: