Operator’s manual – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 69

Advertising
background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

SYSTEM CONFIGURATION / 61

7. Turn the master switch to the ON position.
8. The valve calibration will immediately start.
9. Keep the hydraulics engaged until the calibration is complete. The

calibration may take a minute up to several minutes. Each calibration
step is monitored on the lower left corner of the display.

10. When the calibration is complete, the control shuts down automatically.

All calibration data is automatically stored.

FILL DISK

Fill Disk is used to fill the seed meters after a variety changes or after power
up on air-actuated planters with seed to allow instant seed flow when the
control is turned on. Pressing the Fill Disk button will rotate the seed
meters 1 time, then stop.

FILL DISK FOR A CONTROL CHANNEL

1. Press the Control Setup button.
2. Press the Channel Setup button.
3. Press the Fill Disk button.
4. Raise the implement.
5. With brakes locked and transmission in the park position, start the

engine.

6. Engage hydraulics and run engine at normal speed until hydraulic fluid

is at operating temperature.

Implement will begin to operate after pressing the Start button.
Ensure that all persons and objects are away from the implement
to avoid personal injury.

7. Press the Start button. The seed meters will turn for 1 revolution, then

stop.

8. Pressing the Stop button will also terminate the test.

STOP

Advertising
This manual is related to the following products: