Installation, Operator’s manual, Virtual terminal – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 17: Master switch

Advertising
background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

INSTALLATION / 9

INSTALLATION

VIRTUAL TERMINAL

Reference the Virtual Terminal (VT) operator’s manual for installing the VT
to the tractor cab. Once the Virtual Terminal has been mounted, connect
the Tractor (Cab) Harness as illustrated in

Figure 13

or

Figure 14

.

Figure 6
5” and 10” Virtual Terminals

MASTER SWITCH

1. Install the master switch within easy reach of the operator.
2. Once mounted, connect the master switch to the tractor (cab) harness

as illustrated in (

Figure 13

) or (

Figure 14

).

Figure 7
Master Switch

Advertising
This manual is related to the following products: