Installation, Operator’s manual, Virtual terminal – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual
Page 17: Master switch
Advertising
OPERATOR’S MANUAL
IntelliAg PDC User 2 & 3
11001-1501-200811
INSTALLATION / 9
INSTALLATION
VIRTUAL TERMINAL
Reference the Virtual Terminal (VT) operator’s manual for installing the VT
to the tractor cab. Once the Virtual Terminal has been mounted, connect
the Tractor (Cab) Harness as illustrated in
Figure 13
or
Figure 14
.
Figure 6
5” and 10” Virtual Terminals
MASTER SWITCH
1. Install the master switch within easy reach of the operator.
2. Once mounted, connect the master switch to the tractor (cab) harness
as illustrated in (
Figure 13
) or (
Figure 14
).
Figure 7
Master Switch
Advertising
This manual is related to the following products: