Operation when the power is turned on, Operation flow when the power is turned on, Operation when the power is turned on -5 – KEYENCE IV Series User Manual

Page 55: Operation flow when the power is turned on -5, Operation when the power is turned on 3

Advertising
background image

3-5

- IV Series User's Manual (Monitor) -

Operation when the Power is Turned on

Operation flow when the power is

turned on

Initial start-up of the

monitor

y

Direct Connection

y

Network Connection

Run

Turn on the power

(1)

(2)

(5)

(4)

Connecting...

(3)

Sensor settings menu

Initial start-up of

the sensor

(1) When the power of the monitor is turned on for

the first time, set the display language, date and
time, and the connection method with the sensor.

For the connection method with the sensor, there
are Direct Connection and Network Connection.

“Operation for initial startup of the monitor

(Direct Connection)” (Page 3-6)

“Operation for initial startup of the monitor

(Network Connection)” (Page 3-7)

(2) When the power of the sensor is turned on for

the first time, set the polarity.

“Operation for initial startup of the sensor”

(Page 3-11)

(3)

The Sensor Setup Menu screen opens. Set the
activation condition in Settings Navigator. After the
setting is completed, operation begins.

“Chapter 4 Settings Navigator (Setting the

Judgment Condition)” (Page 4-1)

(4) After the second time of starting the monitor

and sensor, the operation begins when the
power is turned on.

“Chapter 5 Operating/Adjusting” (Page 5-1)

(5) When the connection is failed, the process

remains in the connecting screen.

“Remedy when the Monitor cannot be

Connected with the Sensor” (Page A-28)

The sensor can be independently operated.

Operation when the Power is Turned on

3

Basic Operation

Advertising