Specifications -5, System gas requirements -5, Upon receipt -3 – Hypertherm HSD130 HySpeed Plasma User Manual

Page 71: Claims -3, Installation requirements -3, Placement of system components -3, Torque specifications -3, Upon receipt, Claims, Installation requirements

Advertising
background image

INSTALLATION

HySpeed HSD130 RHF

Instruction Manual

3-3

Upon receipt

• Verify that all system components on your order have been received. Contact your supplier if any items

are missing.

• Inspect the system components for any physical damage that may have occurred during shipping. If there is

evidence of damage, refer to Claims. All communications regarding claims must include the model number and
serial number located on the back of the power supply.

Claims

Claims for damage during shipment

– If your unit was damaged during shipment, you must file a claim with the

carrier. Hypertherm will furnish you with a copy of the bill of lading upon request. If you need additional assistance, call
Customer Service listed in the front of this manual, or your authorized Hypertherm distributor.

Claims for defective or missing merchandise

– If any of the merchandise is defective or missing, contact your

supplier. If you need additional assistance, call Customer Service listed in the front of this manual, or your authorized
Hypertherm distributor.

Installation requirements

All installation and service of the electrical and plumbing systems must conform to national or local
electrical and plumbing codes. This work should be performed only by qualified, licensed personnel.

Direct any technical questions to the nearest Hypertherm Technical Service Department listed in the front of this manual,
or your authorized Hypertherm distributor.

Placement of system components

• Place all system components in position prior to making electrical, gas and interface connections. Use the

diagrams in this section for component placement guidelines.

• Ground all system components to earth. See Recommended grounding and shielding practices in this section

for details.

• To prevent leaks in the system, tighten all gas and water connections as shown below:

Torque specifications

Gas or water

hose size

kgf-cm

lbf-in

lbf-ft

Up to 10 mm (3/8")

8.6-9.8

75-85

6.25-7

12 mm (1/2")

41.5-55

360-480

30-40

Advertising